Project Location: Egypt
Product: SSAW STEEL PIPE WELDED WITH C9 CLUTCH, SHEET PILE, TIE ROD
Standard and Material: S355, S460, S430GP
Main Specification: Diameter 2032mm, Length:28m, 29.5m
Application: Wharf Construction
This project centers on the construction of the ABU QIR wharf in Egypt, a project ultimately earmarked for an Egyptian government undertaking. The wharf construction falls within the category of public services as part of the broader national infrastructure framework.
The project entails a total product weight of 13,000 tons, including steel sheet piles, large-diameter, thick-walled spiral welded pipes equipped with welded C9 lock catches, as well as other relevant components.
To fully uphold its commitment to customers, timely product delivery and ensuring the seamless advancement of the project are of utmost significance. To ensure punctual delivery, our group established multiple production lines. Simultaneously, we coordinated resources in maritime transportation and forged direct partnerships with shipowners.
The products were subjected to self-inspection and rigorous professional third-party testing. Subsequently, they were put into operation in November 2021, making substantial progress in contributing to the development of Egypt's infrastructure.

